18" Waterline from Leeville Booster Station #1 to Golden Meadow Flood Gates

Project Information
 
Job Number:
27108
Job Name:
18" Waterline from Leeville Booster Station #1 to Golden Meadow Flood Gates
City: Leeville La.
Parish: Lafourche
Owner:
Lafourche Parish Water District #1
P.O. Box 399
Lockport, LA  70374
Engineer:
J. Wayne Plaisance, Inc.
P.O. Drawer 730
Galliano, LA  70354
Contract Value:
$2,101,010.00
Start Date: 10/15/07
Completion Date: 04/12/08
General Contractor:
Phylway Construction, LLC
1074A Highway 1
Thibodaux, La. 70301
Job Description:
Installation of approximately 11,000 feet of 18" water line.
 

 