18” Waterline from Leeville Booster Station to Leeville Bridge
North Reach
City:
Leeville, La.
Parish:
Lafourche
Owner:
Lafourche Parish Water District No. 1
5753 Highway 308
Lockport, La. 70374
Engineer:
Badeaux Engineers, Inc.
P.O. Box 1056
Thibodaux, La. 70302
Contract Value:
$1, 149,459.00
Start Date:
07/17/2006
Completion Date:
11/14/2006
General Contractor:
Phylway Construction, LLC
1074A Highway 1
Thibodaux, La. 70301
Job Description:
Installation of 8943 LF of 18” Polyethylene Pipe with concrete weights (PEPW-1), 130 LF of Directional Drilling of 18” PEPW-1, 12” Tapping Sleeve & Valve, and tying into existing South Reach 18” PEPW-1.