Projects > Sitework & Utilities > Agnes Street Area Drainage Improvements

<< Return

Agnes Street Area Drainage Improvements

Project Information
 
Job Number:
26121
Job Name:
Agnes Street Area Drainage Improvements
Flood Control Improvements
State Project No. 576-55-0018
Parish Project No. 02-DRA-36
City: Houma, La.
Parish: Terrebonne
Owner:
Terrebonne Parish Consolidated Government
8026 Main Street
Houma, La. 70363
Engineer:
T. Baker Smith, Inc.
412 South Van Avenue
Houma, La. 70363
Contract Value:
$949,385.00
Start Date: 08/07/2006
Completion Date: 01/03/2007
General Contractor:
Phylway Construction, LLC
1074A Highway 1
Thibodaux, La. 70301
Job Description:

Installation of 1365 LF of Bituminous Coated Corrugated Steel Pipe Arched (BCCSPA) with bedding material and filter fabric, 120 LF of 15 & 18 BCCSP, 50 LF of Arched RCP, 78 LF of 7 X 5 Concrete Box Culvert, 2000 CY of embankment, road subgrade material, 8 concrete pavement, and adjusting existing sewer force mains and waterlines.


 